Understand the idea.
Mass at a point, total to the left
The probability mass function gives the probability at one value. The cumulative distribution function adds all mass at or below its argument, including an endpoint that is possible.
Translate strict inequalities into actual values before adding. For an integer-valued variable, means . If the support is not consecutive integers, list its values rather than assuming every integer can occur.
Recover probabilities from the jumps
A discrete cumulative function is constant between support values and jumps at each value with positive probability. The jump is that value's probability. Therefore a CDF cannot decrease, and its far-left and far-right limits are and .
Subtract cumulative totals to isolate an interval. For an integer-valued variable and integer endpoints , . The subtraction removes only values below the lower endpoint. For other supports, use the cumulative total immediately before that endpoint.
See the method in action.
Build and use cumulative values
X has probabilities 0.1, 0.3, 0.4, 0.2 at 0, 1, 2, 3. Find F(1), P(X > 1) and P(1 < X ≤ 3).
| x | P(X = x) |
|---|---|
| 0 | 1/10 |
| 1 | 3/10 |
| 2 | 2/5 |
| 3 | 1/5 |
Worked solution
- 1
Accumulate through one.
The definition of includes both possible values no larger than .
- 2
Take the complementary upper event.
The events and partition all possible values.
- 3
Identify the values in the final interval.
The lower endpoint is excluded, while the upper endpoint includes the remaining support value .
F(1) = 0.4; both event probabilities are 0.6.
Read a jump
An integer-valued variable has F(0) = 0.2, F(1) = 0.55 and F(2) = 1. Find P(X = 1) and P(X ≥ 1).
Worked solution
- 1
Subtract the cumulative totals around one.
For an integer-valued variable there are no possible values strictly between zero and one.
- 2
Write the complement of at least one.
The complementary event must exclude one rather than remove it.
- 3
Calculate the upper probability.
The given cumulative value already combines every outcome below one.
P(X = 1) = 0.35; P(X ≥ 1) = 0.8.
Try it yourself.
Check your understanding
If F(2) = 0.7, what is P(X > 2)?
Show answer & reasoning
0.3.
Since , its complement is .
Keep practising
6 worksheet questions · 13 marks
Read the questions online
- For probabilities 0.2, 0.5 and 0.3 at , 1, 2, give , and .3 marks
- For the same distribution, find .2 marks
- An integer-valued has and . Find .2 marks
- takes only the values 2, 5 and 8, with probabilities 0.1, 0.6 and 0.3. Find .2 marks
- For integer-valued , and . Find .2 marks
- A proposed cumulative function has and . Explain why it is impossible.2 marks
Read the worked solutions
Equivalent correct methods earn the corresponding marks. Include units where asked.
- For probabilities 0.2, 0.5 and 0.3 at , 1, 2, give , and .3 marks
Take running totals: 0.2; ; .
0.2, 0.7, 1. - For the same distribution, find .2 marks
The event includes and only.
Add .
0.7. - An integer-valued has and . Find .2 marks
Subtract the cumulative total before 3 from the total at 3.
.
0.25. - takes only the values 2, 5 and 8, with probabilities 0.1, 0.6 and 0.3. Find .2 marks
The values no larger than 6 are 2 and 5.
Add ; there need not be mass at 6.
0.7. - For integer-valued , and . Find .2 marks
includes all values up to 4.
Subtract , which excludes everything below 2: .
0.65. - A proposed cumulative function has and . Explain why it is impossible.2 marks
The event is contained in .
Adding possible values cannot reduce total probability.
A cumulative probability cannot decrease.
Curriculum reference & lesson scope
SACE Board of South Australia
Stage 2 Mathematical Methods: discrete random variables and probability distributions, expected value and variance, transformations and independent sums, Bernoulli and binomial models. Original supporting lessons and exercises follow the approved Ascent chapter structure.
Official curriculum source ↗