ASCENTLEARNING
Join a weekly class
Year 8 math worksheets

Year 8 Modelling practical rate problems and checking assumptions Worksheet

Open the PDF above, or read the online version below.

Read the worksheet online

modelling practical rate problems and checking assumptions

  1. A printer produces 18 pages/min. Predict its output in 7 min and state one assumption.
    2 marks
  2. Five volunteers pack 120 boxes in 2 h. At the same rate per volunteer, how many boxes can 8 volunteers pack in 3 h?
    3 marks
  3. One litre of paint covers 8 square metres. A wall is 38 square metres. Paint is sold in whole 1 L tins. How many tins are needed?
    3 marks
  4. A walker averages 4.8 km/h while moving. Predict the time for 3 km. State why the whole journey might take longer.
    3 marks
  5. A service costs AUD 30 plus AUD 50 per hour. Is the total cost directly proportional to hours? Find the cost of 3 h.
    3 marks
  6. A tap supplies 4 L after 1 min, 8 L after 2 min and 11 L after 3 min. Does one exact constant-rate model fit all the data? Explain.
    3 marks